Tender/Prequalification

S.N. Office Tender/Prequalification Notice Status Close Date
1 NEPAL-INDIA ELECTRICITY TRANSMISSION AND TRADE PROJECT

Bidding Document For Supply of ACSR MOOSE Conductor International Competitive Bidding (ICB)


IFB No. NIETTP/G/ICB/COND/75/76-1

Contract Identification No: NIETTP/G/ICB/COND/75/76-1
Date of publication: 2076/1/24 (May 7, 2019)

Download Supportive Documents :


1. Invitation for Bids
2019-06-21
2 Nepal India Electricity Transmission and Trade Project (NIETTP)

Country: Nepal

Project: Nepal India Electricity Transmission and Trade Project (NIETTP)

Sub-Project: Institutional Strengthening Project (ISP)

Assignment Title: Supply, Installation and Implementation of Integrated Financial Management Information System (IFMIS) and Revenue Management System (RMS)

IFB Number: NIETTP-AF-ISP-NCS-IFMIS-075/76-01

Download Supportive Documents :


1. Invitation for Bids
2019-07-09
3 TAMAKOSHI JALVIDHYUT COMPANY LIMITED

Name of Assignment: Preparation of Biodiversity Action Plan (BAP)
RFP Reference No.: TKJVC/075-76/RFP-1
Loan No..: AIIB-S0261A
Country: NEPAL
Date: 31st May, 2019

 

Name of Assignment: Preparation of Supplemental Environmental and Social Documentation
(SESD)
RFP Reference No.: TKJVC/075-76/RFP-2
Loan No.: AIIB-S0261A
Country: NEPAL
Date: 31st May, 2019

Download Supportive Documents :


1. EOI Shortlist Notice
2. Invitation for Bids
3. Request for Proposal
2019-06-10
4 Khimti-Barhabise-Lapsiphedi 400 kV Substation Project Project Management Directorate Matatirtha, Chandragiri-11, Kathmandu

First Date of Publication: 21 May 2019

Project No. and Title:  

50059-003-NEP: SASEC Power Transmission and Distribution System Strengthening Project

Contract No. and Title:   

PMD/PTDSSP/KBL- 075/76-01:
Design, Supply, Installation and Commissioning of 400 kV Gas Insulated Substations at  New Khimti, Barhabise and Lapsiphedi

Deadline for Submission of Bids: 14 July 2019, 12:00 Hours (Nepal Standard Time) 


Download Supportive Documents :


1. Invitation for Bids KBL IFB
2. Vol I_KBL
3. Vol II(Part 1 of 2)_KBL
4. Vol II(Part 2 of 2)_KBL
5. Vol III_KBL
6. Drawings
2019-07-14
5 Power Transmission and Distribution System Strengthening Project

Date: 17 May 2019
Loan No.and Title:50059-NEP: SASEC Power Transmission and Distribution System Strengthening Project


Contract No. and Title:
PMD/PTDSSP/KVWDSEP - 075/76-01: Design, Supply, Installation and Commissioning of Underground Distribution Network under Kirtipur, Kuleshwor, Baneshwor, Balaju and Jorparti Distribution Center including Reinforcement and Automation


Deadline for Submission of Bids:
11 July 2019; 12:00 hours (Nepal Standard Time)

Download Supportive Documents :


1. Notice
2. Vol I
3. Vol II
4. Vol III
2019-07-11
6 KATHMANDU VALLEY SUBSTATION AUTOMATION PROJECT

Procurement of Plant for
Design, Supply, Installation, Integration, Testing and Commissioning of Substation Automation System (SAS) for Existing Grid Substations in Kathmandu Valley
Single-Stage, Two-Envelope


Issued on: 19 April 2019
Invitation for Bids No.: PMD/PTDEEP/KVSAP–075/76 – 01
ICB No.: PMD/PTDEEP/KVSAP–075/76 – 01
Employer: Nepal Electricity Authority
Country: Nepal

Download Supportive Documents :


1. Volume I
2. Volume II
3. Volume III
4. Amendment I
5. Clarification
2019-06-30
7 MARSYANGDI CORRIDOR 220 KV TRANSMISSION LINE PROJECT

BIDDING DOCUMENT FOR
Procurement of Plant
Design, Supply, Installation and Commissioning
Of 220 kV Udipur Substation and New Bharatpur Substation
Single-Stage, Two-Envelope
Bidding Procedure
Issued on: 15th April 2019
Invitation for Bids No.: ICB/PMD/MCTLP/019/20-01
ICB No.: ICB/PMD/MCTLP/019/20-01
Employer: Nepal Electricity Authority
Country: Nepal

First Date of Publication: 15 April 2019
Loan No. and Title: Loan No and Title. FIN 84.065 Serapis No. 2013-0599, Title: Nepal
Power System Expansion Project
Contract No. and Title: ICB/PMD/MCTLP/019/20-01: Design, Supply, Installation and
Commissioning of Udipur Substation and New Bharatpur Substation
Deadline for Submission of Bids: 31st May, 2019 up to 1200 Hours (Nepal Standard Time)

Download Supportive Documents :


1. Volume I
2. Volume II
3. Volume III
4. Vol II Drawings
5. Amendment I
6. Clarification I
2019-05-31
8 Tamakoshi V Hydroelectric Project

REQUEST FOR EXPRESION OF INTEREST (CONSULTING SERVICES – FIRM SELECTION)

First Date of Publication:6th March, 2019
COUNTRY: NEPAL
NAME OF THE PROJECT: Tamakoshi V Hydroelectric Project
Loan No.: AIIB-S0261A

Assignment Title: Selection of Firm for preparation of Biodiversity Action Plan (BAP) for Tamakoshi V Hydroelectric Project Reference No: TKJVC/075-76/EOI-02

Download Supportive Documents :


1. Notice
2. TOR
2019-03-20
9 Tamakoshi V Hydroelectric Project

REQUEST FOR EXPRESION OF INTEREST(REOI) (CONSULTING SERVICES – INDIVIDUAL)
First Date of Publication:6th March, 2019
COUNTRY: NEPAL
NAME OF THE PROJECT: Tamakoshi V Hydroelectric Project
Loan No. /Credit No./Grant No.: AIIB-S0261A

Assignment Title: International Indigenous Peoples Expert (FPICon Specialist) Reference No: TKJVC/075-76/EOI-04

Download Supportive Documents :


1. Notice
2. TOR
2019-03-20
10 Tamakoshi V Hydroelectric Project

REQUEST FOR EXPRESION OF INTEREST(REOI)
(CONSULTING SERVICES – INDIVIDUAL)
First Date of Publication:6th March, 2019
COUNTRY: NEPAL
NAME OF THE PROJECT: Tamakoshi V Hydroelectric Project


Loan No./Credit No./Grant No.: AIIB-S0261A
Assignment Title: Electro-Mechanical Expert
Reference No: TKJVC/ PTE-5

Loan No./Credit No./Grant No.: AIIB-S0261A
Assignment Title: Engineering Geologist
Reference No: TKJVC/ PTE-3

Loan No./Credit No./Grant No.: AIIB-S0261A
Assignment Title: Geotechnical Specialist/Civil Engineer
Reference No: TKJVC/ PTE-2

Loan No./Credit No./Grant No.: AIIB-S0261A
Assignment Title: Hydrological/ Sediment logical Expert
Reference No: TKJVC/ PTE-4

Loan No./Credit No./Grant No.:AIIB-S0261A
Assignment Title: Hydropower Engineer/ Hydraulics Engineer /Civil Engineer as Chair of the Panel of
Technical Experts (PTE)
Reference No: TKJVC/ PTE-1


Download Supportive Documents :


1. Notice for Electromechanical Expert
2. Notice for Engineering Geologist
3. Notice for Geotechnical Expert
4. Notice for Hydrological & sedimentological Expert
5. Notice for Hydropower Expert
6. TOR
2019-03-20
11 Tamakoshi V Hydroelectric Project

REQUEST FOR EXPRESION OF INTEREST (CONSULTING SERVICES – FIRM SELECTION)
First Date of Publication:6th March, 2019
COUNTRY: NEPAL
NAME OF THE PROJECT: Tamakoshi V Hydroelectric Project
Loan No.: AIIB-S0261A

Assignment Title: Selection of Firm for preparation of Supplemental Environmental and Social Documentation (SESD) Reference No: TKJVC/075-76/EOI-03

Download Supportive Documents :


1. Notice
2. TOR
2019-03-20
12 Lekhnath Damauli 220 kV Transmission Line Project

Country: Nepal
Ref-N°.: 2099 14 482
International Invitation for Pre-Qualification


Date of publication: 24th January 2019


Ref: International, Competitive Tender for Consulting Services for the Engineering, Procurement and Construction supervision of the Lekhnath Damauli 220 kV Transmission Line Project and associated works in Nepal);
Project Execution Agency: Nepal Electricity Authority (NEA), Kathmandu


NEA Tender Number : NEA/LD220KVTLP/075-76/EOI-01

Download Supportive Documents :


1. NEA_EOI_LD220KVTLP_7576_01
2. NOTICE EOI PIC NEA LD220KV
2019-02-28
13 Tamakoshi-Kathmandu 220/400 kV Transmission Line Project Project Management Directorate, NEA Training Center Complex Kharipati, Bhaktapur, Nepal

Loan No. and Title: 2808/0270/0271-NEP: Electricity Transmission Expansion and Supply Improvement Project


Contract No. and Title: ICB-PMD-TKTLP-075/76-01-R: Design , Supply, Installation and Commissioning of New Khimti-Barhabise 400kV Transmission Line


Deadline for Submission of Bids: 5 February 2019, 12:00 Hours (Nepal Standard Time)

This Bidding Document for Procurement of Plant – Design, Supply, and Installation, has been prepared by Nepal Electricity Authority and is based on the Standard Bidding Document for Procurement of Plant – Design, Supply, and Installation (SBD Plant) issued by the Asian Development Bank dated December 2015.


ADB’s SBD Plant has the structure and the provisions of the Master Procurement Document entitled “Procurement of Plant – Design, Supply, and Installation”, prepared by multilateral development banks and other public international financial institutions except where ADB-specific considerations have required a change.

Download Supportive Documents :


1. vol-I
2. vol-II
3. vol-III
4. Addendum I
5. Clarification I
2019-02-05
14 Upper Arun Hydroelectric Project

Project : PSRSHDP


Credit No. : 5728-NP


Ref. No. : PSRSHDP/ NEA/S/IND-4 (Hydropower Engineer/Civil Engineer covering dam safety)


PSRSHDP/ NEA/S/IND-8 (GLOF specialist)
PSRSHDP/ NEA/S/IND-9 (Seismologist) and
PSRSHDP/ NEA/S/IND-10 (Electro-mechanical engineer)
Assignment: Provide independent technical review for the consultancy of
Detailed Engineering Design and Preparation of Bidding
Documents for Construction of Upper Arun Hydroelectric
Project and Ikhuwa Khola Hydropower Project

Download Supportive Documents :


1. TOR for DSPOE
2. REOI-Consulting-individual_GLOF
3. REOI-Consulting-individual_Seismologist
4. REOI-Consulting-individual_Electro-mechanical Engineer
5. TOR of Upper Arun and Ikhwa khola
2019-01-10
15 Power Transmission and Distribution Efficiency Enhancement Project

Loan No. and Title: 3542-NEP: Power Transmission and Distribution Efficiency Enhancement Project


Contract No. and Title: PMD/PTDEEP/DTPP-075/76-01: Supply and Delivery of Distribution Transformers (Supply and Delivery of 3D Core CSP Distribution Transformer)


Deadline for Submission of Bids: 10 January 2019 at 12:00 hours (Nepal Standard Time)

This Bidding Document for Procurement of Goods has been prepared by Nepal Electricity Authority and is based on the Standard Bidding Document for the Procurement of Goods issued by the Asian Development Bank, dated December 2016.
This document reflects the structure and the provisions of the Master Procurement Document for the Procurement of Goods, except where specific considerations within the Asian Development Bank have required a change.


Download Supportive Documents :


1. Tender Document
2019-01-10