31 220kV Chilime-Trishuli Transmission System Project Chilime Hub GIS New Substation and Trishuli-3B Hub AIS New Substation (Package 2) The Nepal Electricity Authority (“the Employer”) invites sealed bids from eligible bidders for the design, supply, construction and commissioning of the 220/132/33kV Chilime Hub GIS New Substation (Part-I) and 220(Hybrid)/132/33kV Trishuli-3B Hub AIS New Substation (Part-II).

Download Supportive Documents :


1. Tender Notice
2. Package 2 SS
3. Amendment-I
2017-05-25
32 KATHMANDU VALLEY TRANSMISSION CAPACITY REINFORCEMENT PROJECT This Bidding Document for Procurement of Plant – Design, Supply, and Installation, has been prepared by Nepal Electricity Authority and is based on the Standard Bidding Document for Procurement of Plant – Design, Supply, and Installation (SBD Plant) issued by the Asian Development Bank dated December 2015. ADB’s SBD Plant has the structure and the provisions of the Master Procurement Document entitled “Procurement of Plant – Design, Supply, and Installation”, prepared by multilateral development banks and other public international financial institutions except where ADB-specific considerations have required a change.

Download Supportive Documents :


1. Tender Document Vol I
2. Tender Document Vol II
3. Tender Document Vol III
4. Drawing
5. Clarification Document
6. Extension for Deadline for Bid Submission
2017-05-13
33 Nepal India Electricity Transmission and Trade Project Nepal Electricity Authority has received a credit/grant from Development Partner towards the cost of Nepal- India Electricity Transmission and Trade Project and intends to apply part of the funds to cover eligible payments under the Contract for (i) LOT 1(Contract No: NIETTP-32-W-NCB-4.9-DSPW -1.1) - “Filling Area Protection and Miscellaneous Civil works at Dhalkebar Sub Station”. (ii) LOT 2 (Contract No: NIETTP-32- W-NCB-4.9-DSPW -1.2) - “Extension of Third Floor into Existing Building for the Project Office at Hetuada Substations”. Bidding is open to all eligible Bidders.

Download Supportive Documents :


1. Invitation of Bids
2017-04-30
34 Dudhkoshi Storage Hydroelectric Project The Government of Nepal has received a grant from the Asian Development Bank (ADB) towards the cost of Project Preparatory Facility for Energy. Part of this grant will be used for payments under the contract named above. Bidding is open to all Bidders from eligible source countries of ADB.

Download Supportive Documents :


1. IFB-Notice
2017-04-13
35 ENVIRONMENT AND SOCIAL STUDIES DEPARTMENT Nepal Electricity Authority has received financing assistant from the Asian Development Bank with co-financing from Norway and loan from European Investment Bank toward the cost of Safeguards Implementation and Monitoring Work of SASEC Project and intends to apply part of the proceeds for consulting services

Download Supportive Documents :


1. EOI Notice
2. EOI Document
2017-03-24
36 Load Dispatched Center Supply and Works for the Rehabilitation/Upgrade of the existing Load Dispatch Centre (LDC) at Siuchatar,Kathmandu and for a Back-up LDC to be implemented at different location

Download Supportive Documents :


1. Tender Documents
2. Extension Notice
2017-05-31
37 Upper Arun and Ikhuwa Khola Hydroelectric Project,Environment and social studies Department Nepal Electricity Authority (NEA), intend to construct Upper Arun Hydro-electric Project (UAHEP) and IkhuwaKhola Hydropower Project (IKHP) located in Sankhuwasabha district of eastern development region. The Environment and Social Studies Department (ESSD) of the Engineering Service Directorate of NEA is conducting Fisheries baseline study of Upper Arun Hydroelectric project as a part of Environment and Social Impact Assessment (ESIA) of the proposed Project. The ESSD is seeking qualified national consulting firm for the collection of site specific baseline data for the fisheries and aquatic wildlife study in and around Upper Arun and Ikhuwa Khola. The task to be completed under this assignment will be site specific and conducted at local level.

Download Supportive Documents :


1. EOI Notice
2. Project Information
2017-03-05
38 New Butwal-New Kohalpur-Surkhet-Upper Karnali 400 kV Transmission Line Project, Kharipati, Bhaktapur Consulting Services for Engineering and Environmental Study of Kohalpur-Surkhet-Upper Karnali 400kV Transmission Line and Kohalpur-New Butwal 400kV Transmission Line under the Project Preparatory Facility for Energy

Download Supportive Documents :


1. EOI Notice
2. Project Information Sheet
3. Term of Reference
2017-03-15
39 Reconstruction and Improvement of Electricity in Earthquake Affected Districts. The Government of Nepal has received a Grant from the KfW Development Bank (KfW) towards the Reconstruction and Improvement of Electricity in Earthquake affected Districts Project. Part of this grant will be used for payments under the contract named above. Bidding is open to all Bidders without nationality restrictions. Tender No. and Title: ICB-REIP-073/74-01, Lot 1: Immediate Relief Measure Works (Supply, Delivery and Installation of Line Materials)

Download Supportive Documents :


1. Volume I
2. Volume II
3. Volume III
4. Deadline Extension
2017-02-14
40 Planning and Technical Services Department, Distribution System Rehabilitation Project (Rehabilitation of Existing 33/11 kV Substations) The Government of Nepal has allocated funds towards the cost of Rehabilitation of existing 33/11 kV Substations and Nepal Electricity Authority intends to apply part of the funds to cover eligible payments under the Contract for ICB/PTSD/2073/074-01"Rehabilitation of Existing 33/11 kV Substations." Bidding is open to all eligible Nepalese and Foreign Bidders.

Download Supportive Documents :


1. Volume I
2. Volume II
3. Volume III
2017-02-28
41 Upper Arun Hydro Electric Project The Government of Nepal has obtained financing from the World Bank toward the cost of Power Sector Reform and Sustainable Hydropower Development Project (PSRSHDP) and Nepal Electricity Authority (NEA), as one of the implementing agencies,intends to apply part of the proceeds to procure consulting services for Environmental and Social Impact Assessment (ESIA), Cumulative Impact Assessment (CIA) and Social Planning Studies (SPS) of Upper Arun Hydroelectric Project (UAHEP),and IkhuwaKhola Hydropower Project (IKHPP) (“the Projects”).

Download Supportive Documents :


1. Project Information Outline
2. EOI Notice
3. Amendmend Notice
2017-02-13
42 MARSYANGDI CORRIDOR 220 kV TRANSMISSION LINE PROJECT Procurement of Plant for Udipur-Markichowk-Bharatpur 220 kV Transmission Line (Design, Supply and Install) Single-Stage, Two-Envelope Bidding Procedure Loan No: FIN 84.065 SERAPIS No. 2013-0599 Invitation for Bids No.: ICB-PMD-MCTLP-016/17-01

Download Supportive Documents :


1. Volume I
2. Volume II (Sec 12)
3. Volume III (Cover)
4. Volume III
5. Volume II (Sec 1-11)
6. Addendum I
7. Amendment I
8. Clarification I
2017-01-15
43 Dudhkoshi Storage Hydroelectric Project 1. NEA/ESD/DKSHEP-T-01/2073/74/Works/NCB: Core Drilling 2. NEA/ESD/DKSHEP-T-02/2073/74/Works/NCB: Construction of test Adit. Dudhkoshi Storage Hydroelectric Project, Nepal Electricity Authority.

Download Supportive Documents :


1. Invitation for Bids
2016-11-25
44 Grid Solar and Energy Efficiency Project Design, Supply, Installation/Erection, Testing and Commissioning of 11/0.4 kV Distribution System Contract ID Number: GSEEP/W/ICB-03 Credit No: 5566-NP Grid Solar and Energy Efficiency Project

Download Supportive Documents :


1. IFB
2. Bidding Procedure
3. Technical Specification
4. BOQ and Price Schedule
5. Amendment 1
2016-12-19
45 GRID SOLAR AND ENERGY EFFICIENCY PROJECT Preparation of DLRMP, Design, Supervision and Monitoring of Loss Reduction Project Reference No.: GSEEP/CS/QCBS-02

Download Supportive Documents :


1. EOI Notice
2. TOR
2016-11-11