1 GRID OPERATION DEPARTMENTSUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF
220/132KV, 2X315MVA TRANSFORMERS AT DHALKEBAR
SUBSTATION

Download Supportive Documents :
1. Volume II
2. Volume III
3. Volume I
New 2017-07-13
2 Rasuwa Nuwakot Distribution System Reconstruction and Improvement ProjectTender No. and Title: ICB-REIP-073/74-01, Lot 1: Immediate Relief Measure Works (Supply,
Delivery and Installation of Line Materials)

Download Supportive Documents :
1. Tender Document
New 2017-07-17
3 DORDI CORRIDOR 132 kV TRANSMISSION LINE PROJECT(ICB No: DCTL-073/74-02)The Government of Nepal [GoN] has allocated funds towards the cost of Dordi Corridor 132 kV Transmission
Line Project and intends to apply part of the funds to cover eligible payments under the Contract for Design,
Supply, Construction, Testing and commissioning of Kirtipur 132/11 kV Substation, IFB No. DCTL-
073/74-02.Bidding is open to all eligible Nepalese and Foreign Bidders.

Download Supportive Documents :
1. Volume I
2. Volume II
3. Drawings
4. Volume III
5. Addendum-No.-1
New 2017-07-12
4 DORDI CORRIDOR 132 kV TRANSMISSION LINE PROJECT(ICB No: DCTL-073/74-01)The Bidding Document consists of Parts I, II, and III, which include all the
sections indicated below, and should be read in conjunction with any
addenda issued in accordance with ITB 8.

Download Supportive Documents :
1. Volume I
2. Volume III
3. Drawings
4. Volume II
New 2017-07-10
5 Tamakoshi-Kathmandu 220/400 kV Transmission Line ProjectThis Bidding Document for Procurement of Plant – Design, Supply, and Installation, has been
prepared by Nepal Electricity Authority and is based on the Standard Bidding Document for Procurement of
Plant – Design, Supply, and Installation (SBD Plant) issued by the Asian Development Bank dated
December 2015.
ADB’s SBD Plant has the structure and the provisions of the Master Procurement Document entitled
“Procurement of Plant – Design, Supply, and Installation”, prepared by multilateral development banks and
other public international financial institutions except where ADB-specific considerations have required a
change.

Download Supportive Documents :
1. Volume I
2. Volume II
3. Volume III
4. Drawings
New 2017-07-17
6 LAPSIPHEDI & CHANGUNARAYAN SUBSTATION CONSTRUCTION PROJECTThis Bidding Document for Procurement of Plant – Design, Supply, and Installation, has been
prepared by Nepal Electricity Authority and is based on the Standard Bidding Document for Procurement of
Plant – Design, Supply, and Installation (SBD Plant) issued by the Asian Development Bank dated
December 2015.
ADB’s SBD Plant has the structure and the provisions of the Master Procurement Document entitled
“Procurement of Plant – Design, Supply, and Installation”, prepared by multilateral development banks and
other public international financial institutions except where ADB-specific considerations have required a
change.

Download Supportive Documents :
1. Volume I
2. Volume II
3. Volume III
4. Drawings 2
5. Drawing 1A
6. Drawing 1B
New 2017-07-12
7 Upper Modi Hydroelectric ProjectGovernment of Nepal (GoN) has allocated fund toward the cost of Upper Modi “A” (42 MW) and Upper Modi (18.2 MW) under Upper Modi Hydroelectric Projects and intends to apply a portion of this fund to eligible payments under this Contract.
The Nepal Electricity Authority now invites proposals to provide the following consulting services:
Detail Engineering Design & Preparation of Tender Documents of Upper Modi “A” (42 MW) and Upper Modi (18.2 MW) Hydroelectric Projects
More details on the services are provided in the attached Terms of Reference.

Download Supportive Documents :
1. Request for Proposal
New 2017-07-03
8 Grid Solar and Energy Efficiency Project (GSEEP)The Government of Nepal (hereinafter called” Borrower”) has received financing from the
International Development Association (IDA) (the “Bank”) in the form of credit
(hereinafter called credit toward the cost of Grid Solar and Energy Efficiency Project. The
Nepal Electricity Authority, an implementing agency of the Borrower, intends to apply a
portion of the proceeds of this credit to eligible payments under the contract for which this Request for Proposals is issued. Payments by the Bank will be made only at the request of
the Nepal Electricity Authority and upon approval by the Bank, and will be subject, in all
respects, to the terms and conditions of the financing agreement.

Download Supportive Documents :
1. Request For Proposal
  2017-06-05
9 KALIGANDAKI TRANSMISSION CORRIDOR PROJECTThis Bidding Document for Procurement of Plant – Design, Supply, and Installation,
has been prepared by Nepal Electricity Authority, Project Management Directorate,
Kaligandaki Transmission Corridor Project and is based on the Standard Bidding
Document for Procurement of Plant – Design, Supply, and Installation (SBD Plant) issued
by the Asian Development Bank (ADB) dated December 2016.

Download Supportive Documents :
1. Volume I
2. Volume II
3. Drawing
4. Volume III
5. Clarification
6. Addendum-1
New 2017-06-29
10 SASEC: Power System Expansion Project KALIGANDAKI TRANSMISSION CORRIDOR PROJECTThis Bidding Document for Procurement of Plant – Design, Supply, and Installation,
has been prepared by Nepal Electricity Authority, Project Management Directorate,
Kaligandaki Transmission Corridor Project and is based on the Standard Bidding
Document for Procurement of Plant – Design, Supply, and Installation (SBD Plant) issued
by the Asian Development Bank (ADB) dated December 2016.

Download Supportive Documents :
1. Volume I
2. Volume II
3. Volume III
4. Drawing
5. Vol.II-Chapter03-Annexure
6. Addendum-1
7. Addendum-2
8. Amendment-2
9. Clarification-2
New 2017-06-30