The proposed Supply and lnstallation of Distribution Projects (SIDP) seeks to find solutions to redress the poor supply conditions in NEA's distribution network and to reduce the existing high level of system losses. This project includes supply and installation of 6 nos. of new 33/1 1kV, 3 MVA substations (SS), 2 nos. of new 33/1 1 kV, 6/8 MVA substations (SS) and 33kV new lines for energizing those SS. However, this study focuses on the study of 8 new substations of 5 districts. lmplementation of project would augment the system capacity which would consequently reduce the load shedding hours to some extent and improve the revenue collection for unutilized usable energy.