ENVIRONMENTAL AND SOCIALMANAGEMENT PLAN OF GRID TIED SOLAR POWER PROJECT, BLOCK NO. 3, NUWAKOT (3.5MW)

Updated Date : 2018-04-16
The project site Block No 3; Workshop area and Area behind Trishuli Powerhouse (PH), is selected for installation of PV solar farmhouse with a capacity of 3.5MW. The project site is located at Trishuli Colony area of Bidur Municipality-8 of Nuwakot district. The name of the settlement around the project area is Hattigauda settlement. A total of 5.31ha land will be required for the project, which is already owned by NEA for the construction of Trishuli Hydro power project in FY 2022/23 (1965 AD).
96244767.pdf

Footer Bottom / Start -->