S.N. Tender No Tender Name Company Status Remarks
1 ICB-TD-TKTLP-073/74-01 Tamakoshi-Kathmandu 220/400 kV Transmission Line Project Larson & Turbo Limited, India New Notification
2 UMA /01/2016-17 Detailed Engineering Design and Preperation of EPC Tender Document Upper Modi Cascade (Upper Modi ‘A’ - 42 MW and Upper Modi – 18.2 MW) Hydroelectric Project UPPER MODI HYDROELECTRIC PROJECT New Invitation
Notice RFP
3 ICB-TD-TKTLP-073/74-01 Tamakoshi-Kathmandu 220/400 Kv Transmission Line Project Tamakoshi-Kathmandu 220/400 Kv Transmission Line Project New Notifications
4 UAHEP/ARiQCBS-3 Detailed Engineering Design, Tender Document Preparation, and Construction Supervision and Contract Management of Access Road Construction for Upper Arun Hydroelectric Project Upper Arun Hydroelectric Projec New RFP

5 RFP No.:PSRSHDP/NEA/S/QCBS-1 Detailed Engineering Design and Preparation of Bidding Documents for Construction of Upper Arun HydroElectric Project and Ikhuwa Khola Hydropower Project Upper Arun Hydroelectric Project New LOI
6 NIETTP/W/NCB-4.6/DWS Supply and Installation of Deep Boring and Construction of Reserve Tank in Dhalkebar Substation Nepal-India Electricity Transmission and Trade Project New Selected Bidder: M/s Asian Drilling Company (P.) Ltd. Lokanthali-16 Bhaktapur
Bid Price excluding VAT NRs. 5,525,621.56
7 SC–NCB-072/73–1 Construction of Compound Wall and Miscellaneous Works at Tingla Substation Solu Corridor 132 kV Transmission Line Project New Selected Bidder’s name and address: M/s. Khani/BNC Joint Venture, Kathmandu.
Bid price (excluding VAT): NRs. 1,99,26,355.70
8 ICB-SSP/071/72-1 Design, Supply, Construction, Testing and Commissioning of Syaule 132/33/11 kV Substation M/S EAST INDIA UDYOG/WAIBA INFRATECH JV New Evaluated bid prices of the equivalent of NRs. 280,486,736.40
9 KOSHI/W/71/72/BW&SQ-1.2 Construction of Staff Quarter, Guard house and Compound Wall at Benshwar Substation, Sankhuwasabha M/S Surya/Pushpanjali JV,
Ghattekulo, Kathmandu
New Rs. 47,108,869.00
10 KOSHI/W/71/72/BW&SQ-1.1 Construction of Staff Quarter, Guard house, Compound Wall and protection works at Tumlingtar Substation, Sankhuwasabha M/S Surya/Pushpanjali JV,Ghattekulo, Kathmandu
New Rs. 66,939,330.00